Recommended Tradesmen

Floor Expert Required In LONDON

             

Job details

Replace a section of existing Amtico plank flooring in hallway. Total area is 8 sqm.

The flooring was installed in 2008 and has been fine until this year when it was damaged from a water leak in the adjoining bathroom. It effected approx 3 sqm of flooring to the hallway and doorway entry to living room. Want to replace the full hall way 6 sqm + entry to living 2 sqm.

Floor sub-surface is primed concrete.

MATERIALS SUPPLIED
Amtico flooring planks (10sqm in total)
Adhesive 5L (10 sqm)

Quote for labor to remove existing flooring + apply level screed and lay down next flooring.

Approved quote can start work right away.

  • PROPERTY TYPE Unfurnished
  • ROOM TYPE Hallway
  • AVAILABILITY TO QUOTE Anytime

Other jobs similar to this

Floor Expert Required in ...

posted at 19 Jan 2018, 10:38:03 AM

To remove the current bathroom vinyl and sub floor and polystyrene support ...

E14 8***

Post your job today - it's free!

Tell us what you need and we’ll connect you with authenticated tradesmen in your local area. Post your job with us today and get responses within minutes.

Post a job now